West Main

West Main

West Main Construction of deep right of way modular suspended pavement system with drip irrigation system. Completed right of way planting beds adjacent to modular suspended pavement system. (photo taken after turnover to and maintenance by others) Mid-block raised...
555 Tower Shell & Core

555 Tower Shell & Core

555 Tower Shell & Core Construction of deep right of way modular suspended pavement system with drip irrigation system. Completed right of way planting beds adjacent to modular suspended pavement system. (photo taken after turnover to and maintenance by others)...
555 Tower Tenant Improvements

555 Tower Tenant Improvements

555 Tower Tenant Improvements Planter with drain mat and filter fabric, base sand layer, mist irrigation system, small boulders, woody elements, and irrigation control valve box. Same planter after final placement of boulders and woody elements, and installation of...
Seattle Childrens Hospital Forest B

Seattle Childrens Hospital Forest B

Seattle Childrens Hospital Forest B Planting beds north of main entrance – early conditions prior to foam fill, drain mat, soils, plants, etc. Planting beds north of main entrance after 1 year of establishment. In addition to deep soils in this area, a building...
Block 18

Block 18

Block 18 Looking west: Blanchard Street on-structure planting bed showing installation of drain mat & filter fabric with termination bar, 12″ L-shaped steel edging, deep import soil, irrigation and deep drain rock maintenance strip adjacent to building....