Seattle Childrens Hospital Forest B
Large project site included on-grade and on-structure landscaping at grade; native soil prep; deep import soils; extensive areas of drain mat and filter fabric; large-diameter deep vertical drain inspection assemblies on structure; sub-surface drainage systems; multiple bio-retention planting areas; large boulders with hoisting of boulders, supersacked soils and decorative cobble over building into small renovated interior courtyard connecting old and new buildings; extensive irrigation sleeving; 2-wire drip and spray head irrigation systems; decorative gravels; bio-active wall planting tiles with specialty soils, exotic plants and drip irrigation installation; multi-layer decorative crushed rock walking paths with weathered steel edging; building perimeter drain rock maintenance strips with weathered steel edging; bike racks, trash receptacles and benches; tie-in to and renovation of existing bio-retention planters, ornamental landscaped areas, and irrigation systems; installation of lightweight soils, trees, plants and irrigation within free-standing planters; specimen tree installation; tree, shrub, ornamental grasses, groundcover, and plug installation; sub-surface tree anchoring systems; installation of thousands of bulbs; extensive areas of wildflower seeding; jute erosion-control netting; bark and sand mulches; and maintenance through turnover to Owner.
Special or unusual problems encountered:
Our work on the project spanned over a 2-year+ duration which required multiple mobilizations and good record keeping of work completed, preliminary irrigation installation and capping, sleeving locations prior to hardscape layout, etc. Many areas were unavailable due to ongoing work by other trades. As a result, much of our scope was compressed near the end of the project so several crews were needed in multiple areas simultaneously. This compression of scope and the necessary increase in crew size required intensive management and coordination efforts. Changing site logistics made it challenging for materials deliveries. Accommodations were needed as typical delivery truck sizing would no longer work due to logistics and access, and GC schedule delays created other access issues. Portions of the site were occupied by the Owner, so coordination for installation of materials within certain areas of the site, and in particular the small interior courtyard via mobile crane were difficult. Bio-active wall tile layout to accommodate site lighting conduit and fixtures, as well as irrigation piping was also challenging.
General Contractor:
Landscape Architect: