Cedar Heights Middle Schools Fields Renovations

Cedar Heights Middle Schools Fields Renovations

Cedar Heights Middle Schools Fields Renovations Aerial picture of the project before construction Existing sod being stripped. Wide irrigation trenches to allow for multiple pipes with required spacing. All irrigation lines were bedded with sand. Topsoil being placed...
Magnolia Waterfront Residence

Magnolia Waterfront Residence

Magnolia Waterfront Residence Description:This project was a complete demolition of the existing house and construction of a new house. This included a complete renovation of the landscape. The previous site had a lot of failing railroad tie retaining walls and misc...
Spring District Corporate Headquarters

Spring District Corporate Headquarters

Spring District Corporate Headquarters West Parcel building central courtyard, showing raised planters with 4′ depth soil over drainage layers, and stabilized crushed gravel surfacing between the raised planters. West Parcel central courtyard perimeter raised...
Rover

Rover

Rover East side of roof deck looking south, refurbished initial roof deck conditions at the start of our scope of work. East side of roof deck looking south, mid-progress installation showing elevated turf system support grating, paver walkway, and adjacent cable tray...
Point Defiance Zoo – Asia Forest Sanctuary

Point Defiance Zoo – Asia Forest Sanctuary

Point Defiance Zoo – Asia Forest Sanctuary North site looking southeast: pre-demo conditions North site looking southeast: after demo of existing soils and stream channel, excavation for animal pond, partial installation of drainage system North site looking...