Spring District Corporate Headquarters
Description: Multi-level landscape installation on grade and on structure at two large new buildings. Scope included extensive geosynthetic and gravel drainage layers under all on-structure soils, drainage piping systems, soil prep and multiple blends of deep import soils, structural soil cells, extensive organic soil amendments, grading, edging, irrigation systems, loose-laid decorative gravel surfacing, bound crushed gravel surfacing, stabilized crushed gravel surfacing system, building perimeter gravel drain rock maintenance strips with edging, decorative small rip-rap ballast surfacing, decorative gabion basket walls, sedum plugs and cuttings extensive green roofs, sod lawn, large mature specimen trees, extensive planting, mulch.
General Contractor: Howard S. Wright
Landscape Architect: GGN