Northwood Middle School

Northwood Middle School

Northwood Middle School Natural turf renovation for 2 acre football field at the Northwood Middle School for the Kent School District. Existing Sod and 12” (approx 4,000 cubic yards) of underlying soils were removed and hauled offsite. New underdrainage was installed...
City of Oak Harbor – Windjammer Park

City of Oak Harbor – Windjammer Park

City of Oak Harbor – Windjammer Park Drone picture of entire site. Finished berm, front of building, parking lots and splash park. Al new work around the pavilion and west kitchen. The Windjammer park is a large-scale renovation to an existing park (also known as City...
Rufus 2.0 – Day 1 and Spheres

Rufus 2.0 – Day 1 and Spheres

Rufus 2.0 – Day 1 and Spheres East side of roof deck looking south, refurbished initial roof deck conditions at the start of our scope of work. East side of roof deck looking south, mid-progress installation showing elevated turf system support grating, paver...
The Village at Totem Lake

The Village at Totem Lake

The Village at Totem Lake During Construction Photo. Planting the large 72” box London Plane Trees at the main entry. Each tree took several pieces of large equipment, usually 4-5 men, and an abundance of care and caution during installation. Electrical conduits,...
Lincoln Square

Lincoln Square

Lincoln Square Completed NE 4th Street entrance planting beds Bellevue Way NE planting beds prior to soil installation Completed Bellevue Way NE planting beds with typical gravel surface water drainage collector NE 5th Street entry drive mortar-set flagstone paving...