Cedar Heights Middle Schools Fields Renovations Aerial picture of the project before construction Existing sod being stripped. Wide irrigation trenches to allow for multiple pipes with required spacing. All irrigation lines were bedded with sand. Topsoil being placed...
Magnolia Waterfront Residence Description:This project was a complete demolition of the existing house and construction of a new house. This included a complete renovation of the landscape. The previous site had a lot of failing railroad tie retaining walls and misc...
Spring District Corporate Headquarters West Parcel building central courtyard, showing raised planters with 4′ depth soil over drainage layers, and stabilized crushed gravel surfacing between the raised planters. West Parcel central courtyard perimeter raised...
City of Oak Harbor – Windjammer Park Drone picture of entire site. Finished berm, front of building, parking lots and splash park. Al new work around the pavilion and west kitchen. The Windjammer park is a large-scale renovation to an existing park (also known as City...
The Village at Totem Lake During Construction Photo. Planting the large 72” box London Plane Trees at the main entry. Each tree took several pieces of large equipment, usually 4-5 men, and an abundance of care and caution during installation. Electrical conduits,...
Recent Comments