Cedar Heights Middle Schools Fields Renovations Aerial picture of the project before construction Existing sod being stripped. Wide irrigation trenches to allow for multiple pipes with required spacing. All irrigation lines were bedded with sand. Topsoil being placed...
Northwood Middle School Natural turf renovation for 2 acre football field at the Northwood Middle School for the Kent School District. Existing Sod and 12” (approx 4,000 cubic yards) of underlying soils were removed and hauled offsite. New underdrainage was installed...
Recent Comments